PGCIL Diploma Trainee Answer key 2017 Expected Cut Off Marks

The Power Grid Corporation of India Limited is all set to broadcast soon the answer key and expected cut off mark list of Diploma Trainee examination on the official site. Power Grid Corporation of India has conducted the Diploma Trainee exam few months back, a enormous number of people had attended the exam successfully and all of them are keenly waiting for the result that will upload soon according to the received information.

PGCIL Exam Answer key 2017| Diploma Trainee| Expected Cut Off Marks| Check Online

The Power Grid Corporation of India Limited abbreviated as PGCIL or POWERGRID was set up on 23 October 1989 owned by Indian government. The Power Grid Corporation of India Limited is situated at the Gurgaon, Haryana, India which provides the better facilities to all the employees. The Power Grid Corporation of India Limited industry is mainly operated for the Electric utility. The actual name of the Power Grid Corporation of India Limited is National Power Transmission Corporation Limited. On 8 November 1990, the National Power Transmission Corporation received its Certificate for Commencement of Business after that the name changed into PGCIL (Power Grid Corporation of India Limited).

Web portal: http://www.powergridindia.com/

The chairman and the managing director of the Power System Operation Corporation Limited is Shri I S Jha which managed and controlled all of the work of PGCIL. Power System Operation Corporation Limited which is termed as the name POSOCO operates the power management for Power Grid. Power System Operation Corporation Limited also handles a telecom business company under the name POWERTEL.

Download PGCIL Diploma Trainee Answer key 2017 online

Share

Leave a Reply